this post was submitted on 01 Aug 2023
18 points (95.0% liked)

Ottawa

1282 readers
1 users here now

News, events, discussions, and what not from Ottawa, Ontario.

Municipal website: https://ottawa.ca/


Rules

  1. Be polite and respectful.
  2. Please only post content relevant to the City of Ottawa or to its residents.

Ottawa on the Fediverse:

Ottawa chatrooms:

Please note the following:

* All chatrooms are linked together. If you join one room your messages will be copied to the other platforms.

* Matrix is an open source and potentially distributed chat protocol. The matrix room listed is hosted on matrix.org, a somewhat centralized hub for a lot of currently public rooms. Though the protocol itself is free, libre and open source, the deployment of the protocol resembles a centralized service. This may be fixed in the future with the deployment of independent servers.

* Be aware that both Telegram and Discord are centralized proprietary platforms and do not necessarily protect your rights nor privacy while simultaneously giving power to corporations.

founded 4 years ago
MODERATORS
 

Sigh.

Why does it seem as though admission that they don’t know when the LRT will run again is actually the first glimmer of a hope for resolution?

Even if the price tag will be staggering…

top 3 comments
sorted by: hot top controversial new old
[–] Tristano@lemmy.ca 3 points 2 years ago (1 children)

I wonder if at any point someone will just give up admit it was fucked from the moment they decided to keep the wrong type of train for the service they should be running, and just buy the correct type of train. A proper metro train like every other other city trying to run a mass transit line with high frequency. Ideally something with radial seating, digital signage and wayfinding. Some stations in Japan even have info above where the doors will be in the station showing how full each car is.

We'd need to rebuild all the current stations to be high platforms, and finish the under construction stations to also be high floor. It's a lot of money sure, but no one will care in 50 years, they will just be thankful to have an amazing metro connecting the entire city. The Shinkansen went 2 times over it's inital budget, but no one gives a crap now a days, they're just happy to have it.

We're the capital of Canada, we need and deserve better than this shitty system.

Oh, and add platform screen doors to all the above ground stations, partly for safely, partly for weather, make a huge different to quality of the service.

[–] ijeff@lemdro.id 4 points 2 years ago* (last edited 2 years ago) (1 children)

Our emphasis on selecting the lowest bidder for procurement is a serious issue.

[–] Tristano@lemmy.ca 4 points 2 years ago

A saying I use all the time is, "If you think a professional is expensive, just wait until you hire an amateur."