this post was submitted on 10 Jul 2025
2 points (100.0% liked)

Atlanta News

426 readers
51 users here now

News about Atlanta, auto-sourced from RSS feeds of local and regional media. User names indicate the news source.

founded 2 years ago
MODERATORS
 

Long-sought Atlanta Beltline connection at Ponce is almost real Josh Green Thu, 07/10/2025 - 10:45

Following two years of construction, an infrastructure project designed to immediately improve connectivity to the Atlanta Beltline, jobs, and eastside retail is weeks away from opening, according to Beltline officials. 

A pedestrian connection at Ponce de Leon Avenue near Midtown Place shopping center has been part of the Eastside Trail's plan since before it debuted in 2012. Years, that is, before Ponce City Market even started opening. 

This week, Atlanta Beltline Inc. reports the key link is on pace to finish construction and open sometime this summer, which ends Sept. 22, though plenty of work remains. It will cap work on a broader .7-mile Ponce streetscape project that’s helped make the busy thoroughfare safer and more approachable for pedestrians, bicyclists, and micromobility users.  

alt The view of ramp construction in June from Ponce de Leon Avenue to the Eastside Trail. via Atlanta BeltLine Inc.

The Beltline’s contractor, JHC Construction, is currently finishing railing work on the ramp between Ponce and the Eastside Trail, where columns have been poured and elevated structures are in place. Granite veneering and wall construction for the project has wrapped, as Beltline officials relayed in a recent construction update.   

The project aims to create a more seamless, quicker, and ADA-accessible means of exiting the Beltline for Ponce’s shopping and eating options, and vice versa. 

alt via Atlanta BeltLine Inc.

Included are a steel ramp, stairs, and railings at the northwestern corner of the Ponce-Beltline bridge, similar to Edgewood Avenue’s metal-ramp connection to the Eastside Trail where Old Fourth Ward meets Inman Park. The surface, however, is concrete instead of serrated metal, in order to spare dogs’ feet. (You live, you learn.) 

Previous plans to begin work on the Ponce-Beltline connection in summer 2021 were delayed. Construction kicked off in earnest in summer 2023. 

alt Placement of the new ramp connection and a crosswalk near Ponce City Market's entrance. Courtesy of Atlanta Beltline Inc.

...

Follow us on social media:

Twitter / Facebook/and now: Instagram

• Old Fourth Ward news, discussion (Urbanize Atlanta)

Tags

Atlanta BeltLine

Atlanta Construction

BeltLine Construction

Eastside Trail

Ponce de Leon Avenue

Midtown Atlanta

Midtown Place

Ponce City Market

Alternate Transportation

Alternative Transportation

JHC Construction

Virginia-Highland

Beltline Connections

Midtown Atlanta

Midtown

Images

alt The Ponce-Beltline intersection prior to construction. Google Maps

alt Courtesy of Atlanta Beltline Inc.

alt An example of flexible delineator posts installed in sections of Ponce bike lanes. Courtesy of Atlanta BeltLine Inc.

alt via Atlanta BeltLine Inc.

alt The view of ramp construction in June from Ponce de Leon Avenue to the Eastside Trail. via Atlanta BeltLine Inc.

Subtitle

Key link between Eastside Trail, commercial hubs has been more than a decade in the making

Neighborhood

Old Fourth Ward

Background Image

Image

a new bridge structure leading to a wide concrete pathway near a large parking lot in Atlanta under blue skies.

Before/After Images

Sponsored Post

Off

#Atlanta #UrbanizeAtlanta #theATLBot

no comments (yet)
sorted by: hot top controversial new old
there doesn't seem to be anything here