this post was submitted on 11 Sep 2023
23 points (92.6% liked)

Brisbane

1089 readers
20 users here now

Home of the bin chicken. Visit our friends:

founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] WaterWaiver@aussie.zone 6 points 2 years ago* (last edited 2 years ago)

Turrella station in Sydney has maintained full function during the (still ongoing) elevator installation and stairs rebuild. They've installed temporary stairs on one end. The contractors can be as slow as they want, all it does is make people have to walk an extra 50m.

It's had some shutdowns, but for other work (wires & tracks & signals) and typically short.