this post was submitted on 12 Dec 2025
181 points (98.4% liked)

Technology

77768 readers
2250 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related news or articles.
  3. Be excellent to each other!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, this includes using AI responses and summaries. To ask if your bot can be added please contact a mod.
  9. Check for duplicates before posting, duplicates may be removed
  10. Accounts 7 days and younger will have their posts automatically removed.

Approved Bots


founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
[–] xenomor@lemmy.world 135 points 1 week ago (7 children)

I just don’t understand why this is a difficult question. Make the data centers fund their own power needs. End of story.

[–] Usernameblankface@lemmy.world 32 points 6 days ago* (last edited 6 days ago) (1 children)

Yes. They can pay to build their own sources of power of their own choosing. Or put more resources into doing data centers more efficiently, their choice.

[–] 123@programming.dev 1 points 3 days ago (1 children)

If you leave it up to them, they'll start burning that toxic cheap marine diesel to power the generators. Its not like its hard to get some states to give you exceptions for pollution with some key donations.

Noise pollution around data centers is very bad already based on some news reports, they'll push the limits to save a dollar.

[–] Usernameblankface@lemmy.world 1 points 3 days ago

Yeah, gotta make the environmental factors financially important to them while they're deciding what to do, which is unfortunately a very hard thing to do

[–] aramis87@fedia.io 23 points 6 days ago (1 children)

Make the data centers build their own power plants. Then they get all the risk and all the reward.

Make them put the power plant right next to the data center, that way they're not stressing out the rest of the grid. And that way the exact same community that gets the benefits of hosting the data center also gets the environmental costs of the power plant.

[–] frongt@lemmy.zip 14 points 6 days ago (2 children)

Make the data centers build their own power plants. Then they get all the risk and all the reward.

In theory it's great. In practice it's "oops we had a big spill and went out of business, guess the EPA will have to use taxpayer money".

[–] Passerby6497@lemmy.world 5 points 6 days ago (1 children)

Just because they're a data center doesn't mean they're suddenly immune to the regulations and processes a utility has to go through to build a generator.

[–] shalafi@lemmy.world 2 points 6 days ago

Musk is running filthy methane generators in Memphis to power his datacenter. No permits, nada.

[–] Cocodapuf@lemmy.world 2 points 6 days ago* (last edited 6 days ago)

That's the thing, they only have any interest in "innovative new uses for AI", they aren't interested in delivering power, so they're going to do a shitty job of it, they're going to make a mess that we'll all be left with.

Additionally, if they connect their power to the grid at all, then they need to work seamlessly or the entire grid is at risk. Again, the aspect of their business they don't care about at all has to work seamlessly...

Don't get me started on nuclear, just no. They don't get to play with isotopes.

The risks here are huge, the potential consequences are disastrous to both the economy and the environment. And the potential rewards are what? Lining the pockets of AI grifters? Pushing expensive technology that nobody wants?

[–] avidamoeba@lemmy.ca 8 points 6 days ago* (last edited 6 days ago) (2 children)

When unemployment is low in the construction sector, we can't have them pay. When they pay, they'll outbid us for workers who were previously building homes and public infrastructure. We'd either have to outbid cloud for these workers, or we'd pay by having higher housing prices and crumbling infrastructure, which incurs other social costs. Real resources are finite. The only way for us to not pay is for them to not build the power plants and datacenters. In a truly democratic system we'd be able to say no. In this system, capital outvotes us.

E: I'm not arguing that the corpos shouldn't pay. They should. I'm arguing the economic effect doesn't stop with that payment and we're still fucked.

[–] Blue_Morpho@lemmy.world 13 points 6 days ago* (last edited 6 days ago) (1 children)

The resources are finite whether the taxpayers pay for the construction or the corporation that needs the electric upgrade pays.

[–] avidamoeba@lemmy.ca 6 points 6 days ago

Yes and my point is that even if the corpo pays, which it absolutely should, that's not the end of the economic effect when that resource is used to the limit at the moment. We will end up paying too.

[–] NoneOfUrBusiness@fedia.io 2 points 6 days ago (1 children)

Wouldn't the market just expand to absorb the extra demand?

[–] avidamoeba@lemmy.ca 2 points 6 days ago* (last edited 6 days ago)

The demand for construction workers? If so, it could, if there's enough unemployment. Otherwise workers from some other industry would have to shift to construction. Creating a shortage in that industry. Switching industries is a more difficult process than getting an unemployed worker to work in construction though. But if there's already a labour shortage in the construction industry, then that answers the question. There isn't enough unemployment or shifting from other industries to fill the demand. And there seems to be one.

If there's underemployment in construction or higher unemployment, then yeah, the construction labour market would likely expand without much effect in housing and infrastructure.

[–] SaveTheTuaHawk@lemmy.ca 5 points 6 days ago (2 children)

Then they will build coal plants.

[–] fluffykittycat@slrpnk.net 18 points 6 days ago

Mandate renewable energy and van open loop water cooling. Can't afford it? You don't need a datacenter then

[–] thejml@sh.itjust.works 9 points 6 days ago

This is where requirements as part of the data center zoning and purchase agreements comes in.

[–] Artisian@lemmy.world 4 points 6 days ago (1 children)

I find the different ways places answer this question really interesting. By this, I mean the systems we've had in place, the committees and applications and rules, for power providing the whole time.

It is interesting because power is a privately owned monopoly that we regulate to the extreme; so we get all sorts of weird relationships and arrangements. Now we see them all getting stress tested.

[–] Cocodapuf@lemmy.world 2 points 6 days ago
[–] Cethin@lemmy.zip 2 points 6 days ago

It's actually not as simple as that, assuming they're connected to the grid. Power transmission is costly too, which needs to be accounted for, not just the power consumption/generation. Them being off-grid also isn't really reasonable because they'd need a lot of redundant power sources and backups, which would be better as part of the grid.

They should still be paying for all this, but estimating the real cost is non-trivial.