this post was submitted on 23 Sep 2025
636 points (98.8% liked)
Dogs
5849 readers
103 users here now
A community about dogs.
Breeds, tips and tricks about training and behaviour, news affecting dog owners, canine photography, dog-related art and any questions related to dog ownership.
Rules
- Posts must be related to dogs or dog ownership and must not be void of content.
- This is a neutral space. No bigotry or personal attacks. Criticism should be polite and constructive.
- No automated content. This includes AI generated imagery, post body, articles, comments or automated accounts.
- No advertising or self-promotion.
- Illegal or unethical practices are frowned upon, and any comments or posts suggesting them will be removed. This includes, but is not limited to, backyard breeding, ear and tail cropping, fake service animals, negative reinforcement, alpha/pack/dominance theory, and eugenics.
- No judging or attacking community members who care for dogs with cropped ears, docked tails, or those from puppy mills or questionable sources. While we discourage these practices (per Rule 5), all dogs deserve loving homes and compassionate care regardless of their background or physical alterations.
- No breed discrimination, all breeds welcome. Our stance matches the ASPCA's official stance and is not up for debate.
- Citing your sources when making a claim is encouraged. Misinformation will be removed.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
I worked as a Carpenter for a GC (employed, not contractor), so it was always a fine line between keeping us busy and being efficient by using the right specializations. Yeah I can do some drywall taping and mudding, but god if we aren’t busy, please sub that crap out, it’ll look better anyways. But I’ll also take the 3 days of pay instead.
Plastering I will only ever do for myself, and then only to save money as I am too tight to pay someone else to do it, much the same reason I do tiling or plumbing. They are one of those jobs like fine carpentry that is always better done by an expert with the years of just doing that.
Plasterboard layup often gets left to the builder in the UK, assuming they can actually level it properly.
You mean lath and plaster? They still use that? I mean installing drywall panels and taping the joints and skim coating. But yeah plastering is more like concrete finishing, an art, and definitely left to the professionals.
Would rather place and finish concrete over mudding and taping though, better on my hands.
I would still call it layup as we still use the same plasterboard panels in the UK if they are having a skim or a proper multi coat plaster finish, regardless if they going onto framing or dot and dab onto breeze blocks. We do have old houses that are basically brick on the interior so have render and then plaster on top of that, like nearly 20mm of it.
Its always my shoulder joints with plastering or large tiling that go first, always have too much gear on my board I guess.